Search & qualification
Metalwork, machining, welded assembly, electrical and automation workshops: visited, audited, tested on a first order.

Production overload, sub-assemblies to subcontract, costs to bring down: ATARE finds, qualifies and follows the right production partners in France, Europe and Asia.
Subcontracting means choosing a workshop you have visited, giving it drawings it can read, checking the first part and following the next ones. Based in Thailand and active in Europe, ATARE does this work on site, in both directions.

Metalwork, machining, welded assembly, electrical and automation workshops: visited, audited, tested on a first order.
Drawings, bills of materials, quantities, quality requirements: a file the subcontractor understands the first time.
Inspection of first parts, deliveries and non-conformities — at your existing subcontractors as well as new ones.
Sub-assemblies or complete machines manufactured in Thailand or Southeast Asia, with follow-up on site.
Packaging, transport, customs: coordinated right up to your loading dock.
Moving a production from one site to another without stopping deliveries.
What you want to subcontract, in what quantity, with what requirements.
Three to five qualified workshops, quotes compared, the best ones visited.
Inspection on site, corrections, approval.
Delivery follow-up, quality indicators, price and lead-time adjustments.
A big order from a large group came in when I didn't have the capacity to produce it. ATARE launched the production in Poland for us, with a smart arrangement: only sub-assemblies are made there, so we keep control of our technology. Very pleased with his reliability.
Our Chinese motorcycle parts subcontractor had big quality problems: welding, paint, parts out of tolerance. Renaud travelled to China and sorted it all out on site — jigs, sandblasting, quality checks. We called on him for several years to follow our production. A real teacher, diplomatic and conscientious.
IndustrySetting up a factory in Thailand: start with the first part, not the buildingAn industrial set-up in Southeast Asia doesn't start with a plot of land or a quote, but with the product, the flows and the way of manufacturing.September 22, 2026 · 9 min read
Marketing & webYour dealer network doesn’t just sell your products. It sells your brand.An industrial manufacturer doesn't build its growth by piling up dealers: it builds a brand those dealers have every interest in defending.September 29, 2026 · 7 min read
Business managementDoes your SME need an ERP… or a tool that finally works the way it does?When quotes, orders and stock rely on several files, the problem is no longer IT: you need a simple online tool, suited to the way you work.September 15, 2026 · 7 min readLet's talk directly: our team will get back to you, in Europe, Asia and America.
A question? Ask it here: instant answer, any time.
ATARE virtual assistant. For a quote, she passes your request on to the right team.
A question?Instant answer, any timeAI
Your privacy We would like to measure the site's audience (Google Analytics) to improve it. No advertising, no resale of data. You can change your mind at any time ("Cookies" link at the bottom of the page). Learn more